Yuma County- North Frontage Improvements
Complete Street reconstruction on North Frontage rd. limits from 10E to Fortuna rd.
Underground utilities, grading, site concrete and asphalt paving, retention basin excavation.
Underground Utilities
Storm water improvements to include storm drain manholes, catch basins, culverts, concrete pipe installation, water main and service installation, adjusting services to grade, Fire hydrants, and valves installation
Site Concrete
To include, sidewalk, border curb, valley gutters, vertical curb, vertical curb and gutter, driveways, and handicap ramps.
Grading & Roadway
Asphalt milling, roadways prep, subgrade, fine grade and compaction and reconstruction, Asphalt paving, striping and signs.
Electrical
Traffic signal improvements, to include Electrical- electrical conduit, pole bases, pole lights, electrical trenching, lift station electrical. Traffic signals and components.