Yuma County- 8th Street Improvements

Complete Street reconstruction on 8th street, limits from Ave C to Ave D.

Underground utilities, grading, site concrete and asphalt paving, retention basin excavation, street lighting.

Underground Utilities

To include, sewer main improvements and services, water main and service. Fire hydrants, and valves installation. Storm drainpipe, storm drain force main, catch basins and culverts. Adjusting services to grade.

Site Concrete

To include, sidewalk, vertical curb, vertical curb and gutter, driveways, scuppers and handicap ramps.

Grading & Roadway

Asphalt milling, roadways prep, subgrade, fine grade and compaction and reconstruction, Asphalt paving, striping and signs.

Electrical

Electrical conduit, pole bases, pole lights, electrical trenching, lift station electrical. Traffic signals and components.