Concrete
Site Concrete
DPE’s concrete workforce is subdivided into two divisions that are geared towards their specific specialty. The focus of our civil concrete crews is primarily flat work for roadways, subdivisions, and parking lots. This includes curbs for roads and parking edges, gutters to channel site water runoff, driveways for vehicle access, sidewalks to help create safe pedestrian pathways, and everything in between
Structural Concrete
The structural division is dedicated to all aspects of foundation, footing, and vertical concrete construction. We specialize in footing excavation and slab on grade concrete placement. Our team has the capabilities to construct bridges, headwalls, culverts, catch basins for storm drain systems, and can self-perform all work as it relates to tilt-up buildings and erection. DPE utilizes the latest technology as it relates to laser screeds, concrete pumps, conveyors, and cordless vibratory equipment to produce a quality finished product in the most efficient manner.
All DPE concrete is placed per the American Concrete Institutes (ACI) guidelines and is supervised by certified personnel. With over 125 employees ready to dispatch to your site and decades of experience in the concrete industry amongst the group, we can provide a long-lasting product for any occasion.
Let's Work Together
At DPE, we bring precision, skill, and reliability to every project we touch.
Past Projects
Yuma County Fair Grounds- Midway Relocation
Yuma County Fair Grounds- Midway RelocationDemolition of existing structures, storm drain, sewer main, water service construction, roadway and parking construction for relocation of YUCO fair midway.Underground utilities, grading, site concrete, site demolition and...
Yuma County- North Frontage Improvements
Yuma County- North Frontage ImprovementsComplete Street reconstruction on North Frontage rd. limits from 10E to Fortuna rd. Underground utilities, grading, site concrete and asphalt paving, retention basin excavation.Underground Utilities Storm water improvements to...
Pilot – Travel Center
Pilot – Travel CenterDemolition of existing structures, mass grading, storm drain, sewer main, water service construction, roadway and parking construction, and structural concrete and fuel tank pads for the development of travel facility, with a timeline of 130 days...
